Laserfiche WebLink
BUCKLEN EQUIPMENT CO <br />BUCKLEN EQUIPMENT CO PIT - ID# M- 1982 -131 I Technical Revision <br />EXHIBIT L <br />Exhibit L has been revised as follows from the Amended Mine Permit as approved April 16, 1993. <br />Deletions are indicated by strikeout, additions are noted by bold text. <br />RECLAMATION COSTS <br />As mentioned in Exhibit D, only a portion of the site is disturbed at any time due to mining in <br />stages and concurrent reclamation. This Mining Plan has been designed to limit the amount of <br />handling of the topsoil and overburden material. <br />In order to calculate the reclamation costs at any given time, we have selected two mining stages <br />in Phase 2 of Area A. Area B would be considered to still be in use. <br />As stated in Exhibit D, Area A will be mined at a 3 slope 1 H:1V slope. <br />Slopes will be backfilled using unsaleable material from within the <br />mine limits which includes salvaged overburden and underlying clays. <br />If an operator default occurs, the pit slopes would need to be reclaimed to a <br />3H:1V slope. Area B would be leveled, scarified, topsoiled with six inches of growth medium, and <br />seeded. <br />SUMMARY OF RECLAMATION COSTS <br />Major Disturbance <br />Moderate Disturbance <br />Minor Disturbance <br />Total Reclamation Costs <br />Administrative Fee (15.8 %) <br />Proposed Reclamation Bond <br />Bonded Cost per Acre at 33.16 Acres <br />$1,977.25 $50,115.25 <br />$31,215.75 $34,394.25 <br />$25,161.25 $29,092.50 <br />$61,681.25 $113,602.00 <br />$9,716.11 $17,949.12 <br />$71,150.00 $131,550.00 <br />$2,154.70 $3,967.13 <br />Applegate Group, Inc. <br />