Laserfiche WebLink
Messrs. Morley & Gagliano <br />Page 7 <br />December 24, 2012 <br />Phase one. None of the provided maps indicate where the Central Reservoir is to be <br />located. Please clarify and/or correct all references to Phase One, Phase Two, etc. on all <br />maps and text references. <br />25. Based on information presented in Exhibits C through E, the Division has inferred that <br />slurry walls will be constructed in accordance with OSE standards, leak tested and the <br />engineer's certification provided to the Division prior to exposing groundwater. <br />However, these steps have not been stated explicitly. Please commit to these steps prior <br />to exposing groundwater or clarify the Applicant's intent. <br />6.4.8 EXHIBIT H — Wildlife Information <br />This exhibit is adequate as submitted. <br />6.4.9 EXHIBIT I — Soils Information <br />This exhibit is adequate as submitted. <br />6.4.10 EXHIBIT J — Vegetation Information <br />This exhibit is adequate as submitted. <br />6.4.11 EXHIBIT K — Climate <br />This exhibit is adequate as submitted. <br />6.4.12 EXHIBIT L — Reclamation Costs <br />26. If the Applicant wishes to pursue a phased bond approach, Exhibit L needs to include the <br />final reclamation cost estimate. These cost should be broken down by the phases shown <br />in the mining plan, then ending with the final reclamation plan as the Applicant proposes <br />the site to look like upon the completion of mining and reclamation. The Division would <br />review and comment of the total bond. After an amount is agreed upon, the Division <br />would require a bond be submitted only for the first phase of the proposed operation. <br />Please include bond calculations for all six phases up to and including the proposed water <br />storage features and slurry walls. (NOTE: the Division checked the submitted Exhibit L, <br />assumed to be representative of Please 1 and estimates a bond of $48,273 is more <br />appropriate. Please see the attached summary sheet). <br />6.4.13 EXHIBIT M — Other Permits and Licenses <br />This exhibit is adequate as submitted. <br />6.4.14 EXHIBIT N — Source of Legal Right to Enter <br />This exhibit is adequate as submitted. <br />