My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-29_PERMIT FILE - C2009087 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2012-11-29_PERMIT FILE - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:55 PM
Creation date
12/18/2012 7:59:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
11/29/2012
Doc Name
DRAINAGE AND SEDIMENT CONTROL PLAN
Section_Exhibit Name
Exhibit 2.05.3-E2 Drainage and Sediment Control Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody Sage Creek Mine — Drainage and Sediment Control Plan <br />Stock Ponds <br />T3 <br />T4 <br />T8 <br />T16 <br />T17 <br />T20 <br />T26 <br />T28 <br />T29 <br />T30 <br />T31 <br />T32 <br />T33 <br />8A <br />Ditch RE-D1 <br />Existing Seneca II Mine ditches and culverts that are part of the Peabody Sage Creek Mine <br />postmine drainage control network, but not yet approved as permanent structures by <br />CDRMS, include the following: <br />Channels and Ditches <br />Culverts <br />Channel PL -1 <br />9A <br />Pre -Law Diversion Ditch <br />12A <br />Northwest Diversion Ditch <br />13A <br />Old Boneyard Diversion Ditch <br />15A <br />Office Diversion Ditch <br />31A <br />Ditch RA -D 1 <br />8A <br />Ditch RB -D1 <br />SCCC will construct the following postmine channels for the postmine drainage control <br />network as part of the reclamation plan. In addition, three (3) Peabody Sage Creek Mine <br />culverts will be included in the postmine drainage control network. <br />Channels and Ditches <br />Culverts <br />Channel SCM -1 <br />SC -10 <br />Channel SCM -2 <br />SC -11 <br />Channel SCM -3 <br />SC -12 <br />Channel SCM -4 <br />Channel SCM -5 <br />Ditch RA -1 -D1 <br />Ditch RE-D1 <br />Designs for the postmine channels and culverts are presented in Appendix 2.05.3 -E2.H, <br />Postmine Channel and Culvert Designs. The stock ponds are all pre - existing Seneca II <br />Mine structures. As -built plans for the stock ponds are presented in Appendix 2.05.3 -E2.I, <br />Stock Tank As -Built Reports. <br />2.0 DESIGN METHODOLOGY AND ASSUMPTIONS <br />The hydrologic, hydraulic and sediment calculations used to design the sediment ponds, <br />diversion ditches, haul road ditches, postmine channels and stock ponds were generally <br />performed using SEDCAD4 — a computer program developed by Civil Software Design <br />(Schwab, 1998) used to evaluate storm water, erosion and sediment control management <br />techniques. SEDCAD4 is the most recent generation of the SEDMOT II (Wilson et al, <br />1983) — SEDCAD+ (Schwab, 1988) family of hydrologic models used for some of the <br />earliest Seneca II Mine hydrologic calculations and designs. Several of the diversion ditches <br />found in the Seneca II Mine shop /warehouse area were designed using Soil Conservation <br />Service (SCS) triangular hydrograph techniques (SCS, 1975). <br />TRO 1 -10 2.05.3 -E2.5 12/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.