Laserfiche WebLink
Peabody Sage Creek Mine — Drainage and Sediment Control Plan <br />A series of existing runoff collection ditches and culverts were constructed in the North <br />Facilities Area as part of the Seneca II Mine operations. SCCC will not modify the surface <br />water control network for the North Facilities Area. A series of new ditches and culverts <br />have been designed for the South Facilities and Portal Area. Operations runoff ditch and <br />culvert designs for both facilities areas are found in Appendix 2.05.3 -E2.G, Operational <br />Ditch and Culvert Designs. <br />1.2 Postmine Drainage Control <br />The postmine drainage control plan is shown on Map 2.05.4 M1, Postmine Topography. <br />Most of the postmine drainage channels are existing channels originally constructed as part <br />of the reclamation activities for the closed and reclaimed Seneca II Mine — the channels <br />generally surface runoff from closed and reclaimed operations areas and route the surface <br />runoff to the existing ponds. <br />With the exception of PL -1, CDRMS has approved all of the drainage channels in the Pond <br />002 watershed east of Road "A ", the upper portion of road "Al" and Road `B" in the closed <br />and reclaimed Seneca II mining area as permanent, postmine channels. There are also <br />several existing Seneca II channels south of the South Facilities that are also approved as <br />permanent, postmine channels. Existing channels PM -1 and PM -15 have been redesigned <br />for the Peabody Sage Creek Mine operations. There are several existing road ditches from <br />the historic Seneca II operations that are included in the postmine drainage network but have <br />not yet been approved as permanent, postmine structures. All of the channels in the Pond <br />004 watershed have been approved by CDRMS as permanent, postmine channels. There are <br />no approved postmine channels in the Pond 003 watershed. <br />The following list presents the existing Seneca II mine channels in the Peabody Sage Creek <br />Mine permit area that are approved by CDRMS as permanent, postmine channels: <br />SIIPM -1 <br />SIIPM -2 <br />SIIPM -3 <br />SIIPM -4 <br />SIIPM -5 <br />SIIPM -6 <br />SIIPM -6a <br />SIPM -6b <br />SIIPM -7 <br />SIIPM -9 <br />SIIPM -10 <br />SIIPM -11 <br />SIIPM -12 <br />SIIPM -14 <br />SIIPM -15 <br />SIIPM -16 <br />SIIPM -17 <br />SIIPM -18 <br />SIIPM -19 <br />SIIPM -20 <br />SIIPM -21 <br />SIIPM -22 <br />SIIPM -23 <br />In addition to the permanent channels the following culverts and stock ponds, approved by <br />CDRMS as permanent drainage structures under the Seneca II Mine permit, are in the <br />Peabody Sage Creek Mine permit area and will be utilized as part of the postmine drainage <br />control plan: <br />Culverts <br />2A <br />2AA <br />29A <br />30A <br />32A <br />33A <br />45A <br />47A <br />62A <br />Al <br />A3 <br />A4 <br />A5 <br />TRO 1 -10 <br />2.05.3 -E2.4 <br />12/10 <br />