Laserfiche WebLink
Peabody Sage Creek Mine — Drainage and Sediment Control Plan <br />LIST OF TABLES <br />(continued) <br />Table No. Description <br />Page No. <br />2.05.3 -E2 -5 <br />Operations Ditch Design Schedule <br />2.05.3 -E2.12 <br />2.05.3 -E2 -6 <br />North Facilities Area Diversion Ditch Design Schedule <br />2.05.3 -E2.14 <br />2.05.3 -E2 -7 <br />Postmine Channel Design Schedule <br />2.05.3 -E2.16 <br />2.05.3 -E2 -8 <br />Guide to Retardance Class Selection <br />2.05.3 -E2.18 <br />2.05.3 -E2 -9 <br />TRM Performance Guide <br />2.05.3 -E2.20 <br />2.05.3 -E2 -10 <br />Culvert Conversions — Single Culvert to Multiple Culverts <br />2.05.3 -E2.21 <br />2.05.3 -E2 -11 <br />Operations Culvert Design Schedule <br />2.05.3 -E2.22 <br />2.05.3 -E2 -12 <br />Postmine Culvert Design Schedule <br />2.05.3 -E2 -23 <br />2.05.3 -E2 -13 <br />Permanent Postmine Stock Tanks <br />2.05.3 -E2 -23 <br />2.05.3 -E2 -14 <br />Small Area Exemption Summary <br />2.05.3 -E2 -25 <br />LIST OF APPENDICES <br />Appendix No. <br />Description <br />2.05.3 -E2.A <br />Sediment Pond 002 Design Report <br />2.05.3 -E2.B <br />Sediment Pond 003 As -Built Report <br />2.05.3 -E2.0 <br />Sediment Pond 004 As -Built Report <br />2.05.3 -E2.D <br />PECOCO Pond As -Built Report <br />2.05.3 -E2.E <br />Sump Design Report <br />2.05.3- E2 -E.1 Upper Sump Design Report <br />2.05.3- E2 -E.1 Lower Sump Design Report <br />2.05.3 -E2.F <br />Portal Area Sump Design Report <br />2.05.3 -E2.G <br />Operations Ditch and Culvert Designs <br />2.05.3- E2 -G.1 North Facilities Area (Shop/Warehouse /Office) Diversion Ditch Designs <br />2.05.3- E2.G -2 South Facilities Area (Portal Area) Operations Ditch and Culvert Designs <br />2.05.3- E2.G -3 Turf Reinforcement Mat Design and Installation Information <br />2.05.3 -E2.H <br />Postmine Channel and Culvert Designs <br />2.05.3 -E2.I <br />Stock Tank As -Built Reports <br />2.05.3 -E2.J <br />Small Area Exemption Summary <br />TR -O/ 2.05.3 -E2.ii 04/12 <br />