Laserfiche WebLink
December 12,2012 C-2010-089/New Horizon North Mine MLT <br /> • We visited the concrete structure that was installed by Western Fuels as part of the CCC <br /> West Lateral Ditch relocation (Photo 10). The structure divides the flow into various sub- <br /> laterals, and also charges the HDPE pipe that ultimately carries irrigation flow around the <br /> southern perimeter of the NH Norh permit area. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution <br /> 4.06.4: <br /> • Topsoil salvage operations were beginning once again in the southern portion of the permit <br /> area. Two scrapers were running, stripping topsoil from the"REC" areas just south of the <br /> old highwall location and dumping the material in the southern stockpile (Photos 11 and 12). <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 Page 4 of 12 <br />