Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Place topsoil in disturbed area - 50 acres <br />Permit Action: 2003 AMO2 Unit Cost <br />Site: Penrose Ranch's Update <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />007 <br />12/10/2012 <br />TC1 <br />Total work team cost/hour: $198.32 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />80,667 <br />98,010 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,600 lbs/LCY <br />Top Soil <br />55,200 pounds <br />34.50 LCY <br />State: Colorado <br />County: Fremont <br />Agency or organization name: DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />Equipment Description <br />Cat 623G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />2003 calculation <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Eouinment <br />Swell factor: 1.215 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />18.00 <br />23.00 <br />20.50 <br />20.50 <br />Page 1 of 2 <br />Permit/Job#: M1992016 <br />Filename: M016 -007 <br />Maintenance Eouinment <br />LCY <br />LCY <br />LCY <br />LCY <br />CLRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$64.15 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$109.22 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$198.32 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$198.32 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />SCRAPER TEAM WORK <br />Task description: Place topsoil in disturbed area - 50 acres <br />Permit Action: 2003 AMO2 Unit Cost <br />Site: Penrose Ranch's Update <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />007 <br />12/10/2012 <br />TC1 <br />Total work team cost/hour: $198.32 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />80,667 <br />98,010 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,600 lbs/LCY <br />Top Soil <br />55,200 pounds <br />34.50 LCY <br />State: Colorado <br />County: Fremont <br />Agency or organization name: DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />Equipment Description <br />Cat 623G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />2003 calculation <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Eouinment <br />Swell factor: 1.215 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />18.00 <br />23.00 <br />20.50 <br />20.50 <br />Page 1 of 2 <br />Permit/Job#: M1992016 <br />Filename: M016 -007 <br />Maintenance Eouinment <br />LCY <br />LCY <br />LCY <br />LCY <br />CLRCES Cost Estimating Software <br />