My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-14_INSPECTION - M1992016
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1992016
>
2012-12-14_INSPECTION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:23 PM
Creation date
12/17/2012 3:11:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
INSPECTION
Doc Date
12/14/2012
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
6/4/2012
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip plant and stockpile areas <br />Site: Penrose Ranch's <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 12/10/2012 County: Fremont <br />User: TC1 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total Fleet Cost/Hour: $213.10 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 30.00 acres Rip Depth (ft): 1.00 Volume: 48,400 BCY or CCY <br />HOURLY PRODUCTION <br />Seismic: <br />Area: <br />Agency or organization name: DRMS <br />Basic Machine: <br />Ripper Attachment: <br />Cat D8T - 8U <br />3 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Source of estimated quantity: 2003 estimate w/ dozer upgrade to D8T <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Permit Action: 2003 AMO2 Unit Cost <br />Update Permit/Job #: M1992016 <br />$65.28 <br />$102.84 <br />$6.49 <br />$38.49 <br />$213.10 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA feet/second <br />2.56 mph <br />7.08 degrees <br />300.00 feet <br />88.00 feet <br />0.25 feet <br />0.800 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.800 Acres/hr <br />Site Altitude: 5,300 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />0.66 Acres/hr <br />0.66 Acres/hr <br />Abbreviation: None <br />Filename: M016 -006 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 45.21 Hours <br />Unit cost: $321.115 Per acre <br />Total job cost: $9,633.00 <br />CLRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.