Laserfiche WebLink
"new" ground. CF&I does not anticipate stripping top soil from the 0.1 acre <br /> due to the short length of time the road will be in. Care will be taken when <br /> the temporary road is removed to leave the topsoil in place. It will be <br /> loosened if needed and revegetated to guard against erosion. <br /> Typical Sections <br /> existing access road <br /> temporary road going <br /> down and coming up <br /> from river crossing <br /> existing access road <br /> temporary road <br /> along base <br />