Laserfiche WebLink
4) Erosion Protection. Riprap will be placed on the slopes above and to <br /> the immediate sides of the wing walls of the bridge to protect the slopes from <br /> damage during periods of high flow. <br /> 5) Removal of Temporary Crossing and Road. The temporary river crossing <br /> and temporary access road will be removed and reclaimed as previously <br /> discussed. <br /> dyr <br /> 5 <br />