Laserfiche WebLink
December 10, 2012 C-1982-056/Foidel Creek Mine JDM <br /> South slope of RDA Stockpiled Refuse at middle of RDA <br /> ROADS —Rule 4.03 Construction 4.03.l(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5) and(6) Reclamation 4.03.1(7)/4.03.2(7): <br /> Construction of the coal refuse haulroad has proceeded simultaneously with the construction of the CRDA. The <br /> section of haul road accessing the active CRDA was stable with no problems noted. All other portions of the haul <br /> road were snow-covered and inaccessible at the time of the inspection. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 4 <br />