December 10, 2012 C-1982-056/Foidel Creek Mine JDM <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records N -Reclamation Success <br /> NA -Backfill &Grading N -Revegetation <br /> NA -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives NA - Slides and Other Damage <br /> N -Fish &Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> N -Other NA - Special Categories Of Mining <br /> R -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial coal inspection conducted by Jason Musick of CDRMS. Brian Watterson of Twentymile Coal <br /> accompanied the inspection. The weather was showing with substaintail snoiw cover through our the mine site. <br /> This partial inspection focused on the approved activites associated with the refuse disposal areas. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.053; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Due to construction of the CRDA being completed in phases, initial perimeter ditches are constructed as <br /> temporary ditches. Permanent ditches have been designed,but are not constructed due to the initial stages of <br /> CRDA construction. All temporary CRDA ditches were snow-covered at the time of the inspection. No problems <br /> were noted. <br /> The CRDA has been designed with a toe-drain to prevent any significant build-up of hydrostatic pressure within <br /> the pile. The toe-drain is designed to discharge into the Area 41 Pit. The Northern end of the toe-drain has been <br /> covered with refuse. The outlet of the toe drain was snow-covered at the time of the inspection. No problems <br /> were noted. <br /> GENERAL MINE PLAN COMPLANCE: <br /> The longwall continues to operate in the 15LT panel. One coal train was observed during the inspection. <br /> PROCESSING WASTE/COAL MINE WASTE PILES —Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization, Placement: <br /> The Coal Refuse Disposal Area(CRDA) Expansion was approved through Technical Revisions 67 and 72. The <br /> CRDA expansion area is the only area in which processing waste is being disposed of at the Foidel Creek Mine. <br /> Refuse was being dumped and stockpiled at the time of the inspection with no spreading or compacting operations <br /> observed. It is typical for the refuse to be stockpiled during the winter month's in-order to dry before compaction. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 4 <br />