My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981-11-13_PERMIT FILE - C1981013 (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981013
>
1981-11-13_PERMIT FILE - C1981013 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2020 10:38:56 PM
Creation date
12/11/2012 10:04:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
PERMIT FILE
Doc Date
11/13/1981
Doc Name
Operation And Reclamation Plans
Section_Exhibit Name
Volume 1 Rules 2.05 Exhibit 1-6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 11/15/81 <br /> Backfilling and Grading <br /> The backfilling and grading plan which CF&I Steel Corporation plans to <br /> follow consists of generally rounding and shaping the surface area which <br /> is disturbed at the Maxwell Mine to blend in with the existing <br /> topography. Particular care will be taken to make sure that areas which <br /> have been compacted during their use at the Maxwell Mine will be ripped <br /> or otherwise loosened to promote growth of vegetation. The final <br /> contour which is anticipated after backfilling and grading have been <br /> completed, is shown on the Post-Mining Topography Map (Map 15) . <br /> Particular care will be taken to ensure that erosion prone steep slopes <br /> or long continuous slopes will be avoided where possible. Backfilling <br /> and grading of the coal processing waste areas is not anticipated other <br /> than to ensure proper drainage from these structures. <br /> Topsoil Redistribution <br /> Topsoil material , as shown on the Soils Map (Map 10) , has been removed <br /> where possible prior to disturbance of the surface area at the Maxwell <br /> Mine. Table 14, Topsoil Mass Balance, shows the amount of material and <br /> anticipated schedule of redistribution during the final reclamation of <br /> the Maxwell Mine. Soil material will be removed from the stockpiles <br /> with front end loaders and trucks or wheel scrapers and will be placed <br /> on the regraded surface in a controlled fashion to ensure that all <br /> available stockpiled soil material will be placed on those areas which <br /> have been disturbed. Prior to placement of the topsoil material , the <br /> previously compacted areas, such as roads, will be ripped and otherwise <br /> loosened to ensure that the soil bonds with the regraded surface. <br /> Soil material will be spread evenly over the regraded surface. Actual <br /> grading and placement of the soil material will be completed along the <br /> contour to minimize erosion of the replaced soil . In areas where the <br /> slopes are too steep to permit safe equipment operation along the <br /> contour, the soil material will be placed in the most safe and erosion <br /> 2.05-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.