My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-12-15_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
1984-12-15_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:59:42 AM
Creation date
12/11/2012 9:12:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
12/15/1984
Doc Name
Responses to Permit Conditions and Stipulations
From
Wyoming Fuel Company
To
Mined Land Reclamation
Type & Sequence
PR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C � <br /> -4- <br /> STIPULATION NO. 7 <br /> THE PERMITTEE MUST PLACE A MINIMUM OF ONE FOOT OF SUITABLE MATERIAL OVER THE <br /> UNDERDRAIN TO FORM A GRANULAR FILTER. THIS MATERIAL SHOULD BE GRADED SIMILAR <br /> TO THE GRANULAR FILTER USED BEHIND THE RIPRAP IN THE RELOCATED STREAM CHANNEL <br /> AS FOUND IN ADDENDUM E. SECTION 8 OF THE PERMIT REVISION APPLICATION. <br /> STIPULATION NO. 8 <br /> THE PERMITTEE MUST COMMIT TO PLACING TWO MONITORING WELLS IN THE FILLED <br /> CHANNEL; ONE ON THE UPSTREAM END AND ONE ON THE DOWNSTREAM END. THESE WELLS <br /> SHOULD BE COMPLETED IN THE COBBLE AND GRAVEL FILL AND MONITORED MONTHLY FOR <br /> WATER LEVEL AND QUARTERLY FOR THE SUITE OF PARAMETERS GIVEN IN STIPULATION NO. <br /> 3. <br /> STIPULATION NO. 9 <br /> DURING PREPARATION OF THE SITE OF THE REFUSE DISPOSAL AREA ALL SOIL <br /> MATERIAL MUST BE SALVAGED DOWN TO BEDROCK. THESE MATERIALS MUST BE STOCKPILED <br /> IN A MANNER THAT SEGREGATES THE A AND B HORIZON FROM THE C HORIZON, <br /> STIPULATION NO. 10 <br /> THE PERMITTEE MUST SUBMIT A REVISED VEGETATION SAMPLING PLAN AND METHODOLOGIES <br /> TO THE DIVISION FOR APPROVAL. THIS PLAN MUST INCLUDE SAMPLING FOR PRODUCTION, <br /> AS WELL AS VEGETATIVE COVER, WOODY PLANT DENSITY, AND SPECIES DIVERSITY. <br /> DURING SAMPLING THE PERMITTEE MUST EVALUATE THE POTENTIAL FOR IMPACTS TO RARE <br /> AND ENDANGERED PLANT SPECIES IF IDENTIFIED DURING THE SURVEY. <br /> STIPULATION NO. 11 <br /> THE PERMITTEE MUST LOCATE THE PROPOSED REFERENCE AREAS ON A VEGETATION MAP. <br /> IN ADDITION IT MUST BE STATISTICALLY DEMONSTRATED THAT THESE REFERENCE AREAS <br /> ARE EQUIVALENT TO OR BETTER THAN THE AREA TO BE DISTURBED IN VEGETATIVE COVER <br /> AND PRODUCTION. <br /> STIPULATION NO. 12 <br /> THE PERMITTEE MUST INSTALL CULVERTS IN THE ACCESS ROAD TO THE REFUSE PILE <br /> WHICH-ARE 6__INCHES_LARGER. IN,.DIAMETER _THAN_THOSE SPECIFIED IN ADDENDUM_E OR <br /> INSTALL A 1 . 5 FOOT HEADWALL_ABOVE .CULVERT�INLETS.��IN ADDITION, THE PERMITTEE <br /> MUST JUSTIFY THE USE OF A. 0.03 MANNINGS n FOR DITCH DESIGNS OR INSTALL 1 .5 <br /> U U DEEP DITCHES_ALONG THE REFUSE _PILE ACCESS ROAD. <br /> STIPULATION NO. 13 <br /> SIZING CALCULATIONS FOR THE ACCESS ROAD CULVERT SOUTH OF HIGHWAY 12 MUST BE <br /> SUBMITTED WITHIN 30 DAYS OF PERMIT REVISION APPROVAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.