My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-12-15_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
1984-12-15_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:59:42 AM
Creation date
12/11/2012 9:12:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
12/15/1984
Doc Name
Responses to Permit Conditions and Stipulations
From
Wyoming Fuel Company
To
Mined Land Reclamation
Type & Sequence
PR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> B. THE OPERATOR WILL MAKE QUARTERLY INSPECTIONS OF THE SEDIMENT POND IN <br /> ORDER TO ASSURE THE OPERABILITY OF THE DISCHARGE STRUCTURES AND <br /> STABILITY OF THE EMBANKMENT. <br /> STIPULATION NO. 3 <br /> THE OPERATOR WILL MONITOR EFFLUENT FROM THE SEDIMENT POND AT THE PROPOSED <br /> REFUSE DISPOSAL SITE FOR THE FOLLOWING PARAMETERS: <br /> FLOW pH <br /> Total suspended solids Total dissolved solids <br /> Electro-conductivity Ca <br /> Mg K <br /> Na SAR <br /> F1 So <br /> Al Cr <br /> Cu Fe <br /> Mn Cl <br /> CO3 HCO3 <br /> MONITORING DATA WILL BE SUBMITTED TO THE DIVISION QUARTERLY. <br /> STIPULATION NO. 4 <br /> BEFORE PLACEMENT OF THE CHANNEL LINING, THE OPERATOR MUST TEST THE ROCK <br /> MATERIAL SELECTED ACCORDING TO ACCEPTED ASTM STANDARDS FOR RIPRAP <br /> SUITABILITY: THESE RESULTS SHOULD BE SUBMITTED TO THE DIVISION. <br /> CERTIFICATION BY A QUALIFIED ENGINEER IS REQUIRED FOR THE FOLLOWING: <br /> A. FINAL GRADE AND ALIGNMENT OF THE RELOCATED CHANNEL; AND, <br /> B. PROPER SIZING OF RIPRAP AND GRANULAR FILTER ALONG WITH APPROPRIATE <br /> THICKNESS AND PLACEMENT OF THESE MATERIALS. <br /> THESE CERTIFICATIONS MUST BE SUBMITTED TO THE DIVISION WITHIN 30 DAYS OF <br /> FINAL CONSTRUCTION ON THE CHANNEL DIVERSION. <br /> STIPULATION NO. 5 <br /> THE OPERATOR MUST SUBMIT A PLAN TO DIVERT CHANNEL FLOW (DURING LOW FLOW <br /> SEASON) THROUGH DIVERSION DITCHES OR OTHER APPROPRIATE METHOD WITH A SEDIMENT <br /> CONTROL PLAN DESIGNED FOR THE TEMPORARY DIVERSION. THE DIVERSION SHOULD BE <br /> DESIGNED TO CARRY A MINIMUM FLOW OF 10cfs. THIS PLAN MUST BE SUBMITTED TO THE <br /> DIVISION AS A TECHNICAL REVISION 60 DAYS BEFORE CONSTRUCTION IN THE PRESENT <br /> CHANNEL BEGINS. <br /> STIPULATION NO. 6 <br /> WITHIN60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL ERECT STREAM BUFFER <br /> ZONE SIGNS ON ALL_AREAS- BORDERING THE MIDDLE FORK OF THE PURGATOIRE RIVER <br /> WITHIN AND DIRECTLY ADJACENT TO THE PERMITTED DISTURBED AREA. THESE SIGNS <br /> MUST BE ERECTED AT THE EDGE OF THE DISTURBED/UNDISTURBED AREA OR 100 FEET FROM <br /> THE EDGE OF THE STREAM, WHICHEVER IS LESS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.