Laserfiche WebLink
Loader Worksheet Cont'd Task # 004 Page 2 of 2 <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.7498 minutes <br />Total Cycle Time: 1.2223 minutes <br />Load Bucket Capacity <br />Rated Capacity: 3.90 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 4.29 LCY <br />Job Condition Correction Factors <br />Site Altitude: 9100 feet <br />Unadjusted Hourly Unit Production: 210.58 LCY /Hour <br />Adjusted Hourly Unit Production: 174.78 LCY/Hour <br />Adjusted Hourly Fleet Production: 174.78 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 9.23 Hours <br />Unit cost: $0.560 /LCY Total job cost: $903.00 <br />CIRCES Cost Estimating Software <br />9 of..2v <br />