My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2012-12-06_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:21 PM
Creation date
12/11/2012 7:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
REVISION
Doc Date
12/6/2012
Doc Name
Request for Bond Reduction
From
Telluride Stone Co.
To
DRMS
Type & Sequence
SR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Length <br />(feet) <br />Factor (min.) <br />Source <br />Material: <br />Material up to 1/8" diameter 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Task description: <br />Site: Airport Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />004 State: <br />7/18/2012 County: <br />RCO <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 938H <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />1,613 <br />1,613 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Rolling Resistance — Road <br />Haul: <br />Return: <br />Haul and Return Time <br />WHEEL LOADER — LOAD AND CARRY WORK <br />Carry topsoil to pit <br />Conditions <br />Permit Action: TR -1 Permit/Job #: M2011013 <br />DRMS <br />$22.07 <br />$37.34 <br />$38.49 <br />$97.90 <br />$97.90 <br />Colorado <br />San Miguel <br />LCY <br />Cat Handbook <br />Utilization % <br />NA <br />100 <br />NA <br />Division of Reclamation, Mining & Safety <br />Horsepower: <br />Shift Basis: <br />Data Source: <br />CCY Swell factor: 1.000 <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: 0.473 <br />Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M013 -004 <br />0.483 <br />172 <br />1 per day <br />(CRG) <br />minutes <br />-0.010 <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />p of ad <br />Length <br />(feet) <br />Grade Res. <br />( %) <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Travel Time <br />(minutes) <br />Source <br />Haul Route: <br />400 <br />5.00 <br />4.00 <br />9.00 <br />0.4811 <br />(Cat HB) <br />Return Route: <br />400 <br />-5.00 <br />4.00 <br />-1.00 <br />0.2687 <br />(Cat HB) <br />Task description: <br />Site: Airport Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />004 State: <br />7/18/2012 County: <br />RCO <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 938H <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />1,613 <br />1,613 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Rolling Resistance — Road <br />Haul: <br />Return: <br />Haul and Return Time <br />WHEEL LOADER — LOAD AND CARRY WORK <br />Carry topsoil to pit <br />Conditions <br />Permit Action: TR -1 Permit/Job #: M2011013 <br />DRMS <br />$22.07 <br />$37.34 <br />$38.49 <br />$97.90 <br />$97.90 <br />Colorado <br />San Miguel <br />LCY <br />Cat Handbook <br />Utilization % <br />NA <br />100 <br />NA <br />Division of Reclamation, Mining & Safety <br />Horsepower: <br />Shift Basis: <br />Data Source: <br />CCY Swell factor: 1.000 <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: 0.473 <br />Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M013 -004 <br />0.483 <br />172 <br />1 per day <br />(CRG) <br />minutes <br />-0.010 <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />p of ad <br />
The URL can be used to link to this page
Your browser does not support the video tag.