My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1995-09-08_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:51:12 AM
Creation date
12/10/2012 7:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/8/1995
Doc Name
Construction Designs, Schedules, and Project Outlines.
From
Cyprus Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be marked on As-Built Drawings unless the location is visible and <br /> clearly evident. <br /> 5.1.5 The drain shall be installed with a minimum slope of three inches <br /> (3") in ten feet 001. <br /> 5.2 REINFORCED CONCRETE PIPE (RCP) <br /> 5.2.1 RCP outlet piping shall be installed on uniform grades as shown on <br /> the Drawings. Care shall be taken to avoid hills and valleys in the <br /> pipeline profile. <br /> 5.2.2 The pipe shall be installed on a reinforced concrete cradle as <br /> shown on the Drawings. The cradle shall be installed against <br /> undisturbed embankment fill, bedrock, or on a lean concrete fill <br /> placed to bring the foundation to grade. Concrete or other <br /> approved block shall be used to elevate the pipe above the lower <br /> cradle pour to assure complete encasement of the lower portion <br /> of the pipe as shown in the Drawings. The pipe bell may be used <br /> in lieu of a support block. The pipe shall be blocked in position to <br /> assure no lateral movement (rolling) occurs after pipe positioning, <br /> and prior to and during placement of the upper cradle section (See <br /> Specification B - Concrete, Section 8.4). The upper concrete <br /> cradle walls shall be battered. <br /> 5.2.3 The RCP outlet piping shall be field tested for leakage at the <br /> Contractor's expense prior to placement of backfill. The leakage <br /> test shall be conducted by filling the pipe with water and applying <br /> a minimum pressure of 10 psi at the highest point of the pipe for <br /> at least one hour. All visible leaks shall be repaired. <br /> 5.3 STEEL PIPE <br /> 5.3.1 All steel pipes shall be installed in accordance with AWWA C 200. <br /> 5.3.2 Steel pipe assemblies shall be fabricated in accordance with <br /> AW WA C 200. <br /> 5.3.3 Steel pipe and pipe assemblies shall be installed at the locations, <br /> slopes, and lines shown on the Drawings. <br /> SPECIFICATION C - PIPING <br /> PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.