My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1995-09-08_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:51:12 AM
Creation date
12/10/2012 7:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/8/1995
Doc Name
Construction Designs, Schedules, and Project Outlines.
From
Cyprus Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 REINFORCED CONCRETE PIPE (RCP) <br /> 4.2.1 Reinforced concrete pipe shall be furnished complete with jointing <br /> materials and other necessary appurtenances. <br /> 4.2.2 Reinforced concrete pipe shall meet the requirements for Class V, <br /> B-Wall Reinforced Concrete Pipe and shall have a minimum wall <br /> thickness of four inches (4"). The conduit shall be designed to <br /> withstand the maximum loads based on the conditions shown on <br /> the Drawings. These loads shall include but not be limited to the <br /> following: <br /> 1. Hydrostatic head of not less than 45 feet. <br /> 2. Dam embankment soil pressures utilizing a unit weight <br /> of 135 pounds per cubic foot. Factored embankment <br /> design loads shall be a minimum of 33.4 kip per lineal <br /> foot vertical and combined vertical and horizontal load <br /> of 23.2 kip per lineal foot and 6.2 kip per lineal foot, <br /> respectively. <br /> 3. Thermal expansion and contraction. <br /> 4.2.3 Reinforced concrete pipe and specials for the inlet shall meet the <br /> requirements for Class V Reinforced Concrete Pipe manufactured <br /> in accordance with ASTM C 361. When design parameter are <br /> above and beyond those given in ASTM C 361 Table 1, manufac- <br /> turer shall utilize Section 7, Paragraph 7.2 (Modified and Special <br /> Design). Modified design shall be performed using the "Direct <br /> Design Method" (e.g. FHWA, PIPECAR Program) and submitted to <br /> the design engineer for approval. <br /> 4.2.4 Circumferential reinforcement shall be full-circle type and shall <br /> consist of an inner and outer cage. Elliptical or part-circle <br /> reinforcement will not be acceptable. The minimum area of <br /> reinforcement, the spacing, and placement details shall be in <br /> accordance with ASTM C 361 and AWWA C 302. <br /> SPECIFICATION C - PIPING <br /> PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.