My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1995-09-08_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:51:12 AM
Creation date
12/10/2012 7:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/8/1995
Doc Name
Construction Designs, Schedules, and Project Outlines.
From
Cyprus Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.1 CENTRAL MIXED <br /> The materials completely mixed in a stationary mixer and trans- <br /> ported to the delivery point in a truck agitator, a truck mixer <br /> operating as a truck agitator or an approved nonagitating truck. <br /> 6.4.2 SHRINK MIXED <br /> The materials partially mixed or blended in a stationary mixer and <br /> the mixing completed in a truck mixer en route to or at the job. <br /> 6.4.3 TRANSIT MIXED <br /> The materials completely mixed in a truck mixer. <br /> 6.5 LOAD CONTROL <br /> The Engineer will make slump tests made from samples taken at approxi- <br /> mately the one-quarter (1/4) and three-quarter (314) points of the load. <br /> When the above pairs of slumps differ by more than two inches (2"), the <br /> truck or agitator will not be re-used until the condition causing this non- <br /> uniformity has been corrected. <br /> 6.6 RETEMPERING <br /> Water shall not be added to mixed batches of concrete to increase the <br /> slump without specific written authorization of the Engineer. When batches <br /> delivered to the job show an unduly low slump (as might occur during hot <br /> weather), the Engineer, at his or her sole discretion, may grant permission <br /> for the Contractor to use retarders. <br /> 7 REINFORCEMENT <br /> 7.1 DRAWINGS <br /> Prints of placement drawings shall be prepared by the Contractor's supplier <br /> and reviewed by the Engineer prior to any fabrication of reinforcement bars. <br /> 7.2 FABRICATION <br /> 7.2.1 BAR CUTTING <br /> Bars shall be cut by shearing only. Torch cutting will not be <br /> permitted. <br /> SPEC. B - CONCRETE <br /> PAGE 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.