My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1995-09-08_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:51:12 AM
Creation date
12/10/2012 7:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/8/1995
Doc Name
Construction Designs, Schedules, and Project Outlines.
From
Cyprus Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the required uniformity of mixture of each of the types of earth <br /> materials at the borrow areas. <br /> 8.1.3 Materials shall be inspected and classified as specified in Section 6 <br /> during excavation activities. Zone 1, Zone 2, and riprap materials <br /> shall be excavated, hauled, and stockpiled separately to ensure <br /> segregation of the materials. Segregation of materials shall be <br /> accomplished to the satisfaction of the Engineer. <br /> 8.1.4 Organic soils and topsoil material stripped from borrow and the <br /> embankment shall be stockpiled at a location designated by the <br /> Engineer for later use on the downstream face of the dam and for <br /> use in reclamation of disturbed areas. <br /> 8.1.5 Stockpile locations shall consist of relatively level, well drained <br /> areas. The selected areas shall be subject to approval by the <br /> Engineer. <br /> 8.1.6 Temporary silt fences shall be constructed along the outside <br /> perimeter of each stockpile area. <br /> 9 FOUNDATION PREPARATION <br /> 9.1 GENERAL <br /> All topsoil, sod, and organic materials shall be stripped from the areas upon <br /> which the embankment fill is to be placed. All stripping, leveling and proof rolling <br /> of foundation surfaces on which the embankment fill is to be placed shall be <br /> accomplished to the satisfaction of the Engineer. No earth materials shall be <br /> placed until the condition of the surface on or against which it is to be placed has <br /> been inspected and accepted by the Engineer. <br /> 9.1.1 The excavation of foundation shall be made to the depths indicated <br /> on the Drawings or as required to remove topsoil, soft and deleteri- <br /> ous material, and to provide a reasonably level surface. <br /> 9.1.2 Prior to placing any fill, the subgrade should be scarified, moistened <br /> as required and compacted to ninety-eight percent (98%) Standard <br /> SPEC.A- EARTHWORK <br /> PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.