My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-04_REVISION - M1977493 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1996-06-04_REVISION - M1977493 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:02 PM
Creation date
12/10/2012 7:27:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
6/4/1996
Doc Name
Preliminary Design for new Environmental Protection Facility.
From
Climax
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP STATION ELECTRICAL <br /> The pump station electrical system preliminary design was modified to reflect the <br /> changes described above. One of the 300 horsepower pump starters was eliminated from <br /> the motor control center and the cost of the conduit and wire associated with the third and <br /> fourth pumps was also eliminated. Assuming that a maximum of two 300 horsepower <br /> pumps would be operated at one time, the size of the transformer and main breaker could <br /> be reduced to 1000 KVA capacity. However, there could still be a cost savings by using <br /> the 2000 KVA transformer that is currently owned by Climax if it is available and in good <br /> condition. In addition, it might be advisable to install the larger transformer to provide <br /> potential future flexibility to dredge and return sludge from the seepwater pond. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.