My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-04_REVISION - M1977493 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1996-06-04_REVISION - M1977493 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:02 PM
Creation date
12/10/2012 7:27:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
6/4/1996
Doc Name
Preliminary Design for new Environmental Protection Facility.
From
Climax
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
engineered metal building. The basic loading criteria used for the preliminary design of the <br /> building are as follows: <br /> • Live Load: 125 psf <br /> • Snow Load: 115 psf <br /> • Wind Speed: 80 mph, Exposure C <br /> • Seismic Zone 1 <br /> In addition to the three 629 pumps and new,motors described above, the pump <br /> station would consist of the following additional items: <br /> • Crane aisle hoist system or alternately, a center pivot jib crane. The set <br /> length of the pumps is fairly long (17.5 feet). This design assumes that the <br /> pumps will be disassembled as they are pulled. The alternative would be <br /> to increase the height of the building by 6 to 7 feet, or install hatches in the <br /> roof and eliminate the hoist system. <br /> • Electric Heat. <br /> • Two 3070 manway doors and one 1010 garage door with automatic <br /> opener. <br /> • One electric vent fan. <br /> • Bubbler system for ice control. <br /> • Structural steel support system over the intake sump covered with grating. <br /> • Adjustable intake sump level using 4x12 treated timbers (as shown on the <br /> drawing). <br /> • Milltronics ultrasonic sump level indicator. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.