Laserfiche WebLink
TAELE 1 <br /> HYDROLCGY MONITORING REQUIREXENTS <br /> NEW ELK AND GOLDEN EAGLE MINES <br /> Revised Stipulation No. 12 - New Elk Mine <br /> and Stipulation No. 10 - Golden Eagle Mine <br /> August, 1985 <br /> Water Level Field Short Discharge <br /> Site or Flow Measurement List* List* <br /> PRS-1 M M A <br /> PRS-2 M M A <br /> PRS-3 M M A <br /> MDNE-1 M M A _Q <br /> MDGE-1 M M A Q <br /> CCS-1 M M A Q <br /> CCS-2 M M A Q <br /> ACF-I** C Q <br /> SCF-lx* C Q <br /> PAW-1 Q Q A <br /> PAW-2 Q Q . A <br /> PAW-5 Q Q A <br /> PAW-6 Q Q A Q <br /> Backfilled <br /> Channel A'W <br /> (East) Q Q A <br /> Backf i l l ed <br /> Channel AW <br /> (West) Q Q A <br /> RDA Pond <br /> Effluent A <br /> ACAW-1** Q Q A <br /> CCA'W-1 Q Q A <br /> Kev <br /> C = continuously <br /> M = monthly <br /> Q = quarterly (FebruarMay, August, November) <br /> A = annually (November?, <br /> * See attached table for parameters included in each suite. <br /> ** Not required until further disturbance as per revised Stipulation No. 14 <br /> 3CS1=/cj <br /> -9- <br />