My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-09-25_HYDROLOGY - M1977493
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1996-09-25_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 6:53:04 AM
Creation date
12/7/2012 11:09:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
9/25/1996
Doc Name
Tailing Removal Project in Eagle Park Reservoir
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> W. W. Wheeler and Assoaates, Inc. <br /> Water Resources Engineers <br /> September 24, 1996 <br /> Mr. John Clapper, Site Manager <br /> Mr. Bryce Romig, Environmental Manager <br /> Climax Molybdenum Company <br /> Climax Mine <br /> Highway 91, Fremont Pass <br /> Climax, Colorado 80429 <br /> Re. #►1051.17 Climax Mina <br /> Dam 4 Seepwater <br /> Return System <br /> Dear John and Bryce., <br /> We have completed the design of the pipeline and pump station modifications that <br /> will allow the existing Dam 4 Seepwater Pump Station to be used to deliver seepage from <br /> Dam 4 to Robinson Reservoir. Enclosed are 11 A 7 size drawings for the project. These <br /> drawings are updated versions, with revisions as discussed, of the drawings that have <br /> previously been given to you for this project. The following is a brief description of the <br /> various components of the proposed system as well as the design parameters and <br /> assumptions used. The description below was written in a format such that it may be <br /> used as the design report for the project If required by the regulatory agencies involved. <br /> Backaround <br /> Dam 4 was originally constructed In the mid-1960's in the Eagle River Valley for <br /> the purpose of storing oxide tailing produced from the milling process at the Climax Mine. <br /> The impoundment was only used for this purpose for a few years until the oxide mill circuit <br /> was abandoned and tailing deliveries to Dam 4 ceased. The tailings that were deposited <br /> in the impoundment during this time period are currently being removed in an effort to <br /> convert the structure to a fresh water reservoir to be known as Eagle Park Reservoir. The <br /> specific location of the structure is the northwest quarter of Section 33, Township 7 <br /> 3700 South Inca Street Englewood, Colorodo 80110 (303) 761-4130 FAX (303) 761-2802 <br /> ZO' d ZOO' ON TV: T T 96 VZ daS Z'OK-T9Z-202-T : 131 3OSSd '8 Ja t aaum - m- m <br />
The URL can be used to link to this page
Your browser does not support the video tag.