My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-09-25_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1996-09-25_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 6:53:04 AM
Creation date
12/7/2012 11:09:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
9/25/1996
Doc Name
Tailing Removal Project in Eagle Park Reservoir
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MOLYBDENUM COMPANY COLORADO OPERATIONS <br /> MinA Division of Cyprus Climax Metals Co Climax Hwy 91 91 <br /> Climax,Colorado 80429 <br /> �� (719)486-215 <br /> e �^ / 9 77 Fax(719)486-2251 <br /> I j'' I / � <br /> September 25, 1996 <br /> Hand Delivered RECEIVED <br /> Mr. Allen Sorenson �P 2 51996 <br /> Environmental Protection Specialist <br /> Division of Minerals and Geology ' <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Dear Mr. Sorenson: <br /> The attached information discusses the continuing implementation of environmental <br /> protection measures associated with the tailing removal project in Eagle Park Reservoir. <br /> To date, we have addressed the installation of 4-Dam Outlet or ks, t h6 installation of a <br /> cut-off wall at the toe of Robinson Reservoir, and measures toward improved water <br /> handling in Robinson Reservoir using a new impoundment at the toe of 1-Dam. Under <br /> the Climax Mine Environmental Protection Plan, a final additional measure has been <br /> considered and designed. <br /> The 4-Dam Seepwater Return System is an Environmental Protection Facility in the <br /> Eagle River Basin at the toe of 4-Dam. While Climax expects that tailing removal and <br /> flushing of the foundation materials will occur over a period of several years, temporary <br /> management of these waters is needed. Until water quality at the toe of 4-Dam meets <br /> standards for the receiving stream, pumping of the containment system at the dam toe <br /> will be provided to Robinson Reservoir. The attached dialog and design sheets are <br /> herein submitted to the Division for review and acceptance as an Environmental <br /> Protection Facility modification. <br /> Climax would appreciate your review and input in as short a time frame as possible. I <br /> would be happy to discuss details and considerations made in this modification to <br /> facilitate your understanding of the protection measures it affords. <br /> Sincerely, <br /> Bryce R. Romig <br /> Environmental Coordinator <br /> Climax Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.