Laserfiche WebLink
Allen Sorenson - DMV <br /> April 9, 1997 <br /> Page 2 <br /> probe setup is adjacent to the pump structure and tied directly into the same <br /> perforated pipe as the pumps. <br /> 3. Enclosed for your information is a design for construction of an improved spillway for <br /> Eagle Park Reservoir. This design has been forwarded to the Office of the State <br /> Engineer for approval. <br /> Please be advised that additional information is forthcoming concerning plans for the <br /> east end of Robinson Lake including plans for water conveyance to the 1-Dam <br /> (Warren's) pump station, Robinson Lake sludge management, and additional capture of <br /> topsoil. In addition, revised reclamation methodologies for plant materials, soil <br /> amendment use, and topsoil management are being prepared in the form of a Technical <br /> Revision. <br /> Thank you in advance for Division review of this information. Please contact.me if you <br /> require additional information. <br /> Sincerely, <br /> Bryce Romig <br /> Environmental Coordinator <br /> Climax Mine <br />