My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-01-27_REVISION - M1977493 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1994-01-27_REVISION - M1977493 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:31 PM
Creation date
12/5/2012 9:17:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
1/27/1994
Doc Name
TR Approval
From
DMG
To
Climax
Type & Sequence
TR5
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF PROJECT <br /> Tailing relocation: <br /> The tailing is transferred to an existing tailing <br /> deposition area utilizing a Hydraulic Monitoring resIurr_y <br /> method . High pressure (300-400 psi ) water is used to <br /> wash and suspend the tai � inu solids in a slurry mixture <br /> wnich is then drawn by an eductor into a slurry pump <br /> intake feed tank . A series of slurry booster pumps <br /> transports the material uphill through a fourteen- inch <br /> (14" ) HDPE pipeline , across the existing No .2 Dam <br /> (Robinson Tailing Pond) to the east side of the existing <br /> Tenmile Tailing Pond . The slurry is then deposited on the <br /> tailing pond utilizing a normal tailing deposition method <br /> wherein the suspended solids are precipitated from <br /> solution , and the water is decanted for reuse in the <br /> process . <br /> Dam Modifications: <br /> The existing dam was approved as a water storage structure <br /> by the State Engineer in 1979 . Upon completion of the <br /> tailing removal , outlet facilities will be constructed <br /> through the existing dam. Design of the ancillary <br /> structures is in progress and approval by the State <br /> Engineer will be sought prior to construction . The <br /> feasibility of future enlargement of the existing dam is <br /> also beinq evaluated at this time . <br /> Construction Site Reclamation: <br /> Upon Completion of the tailing reclamation , all sites <br /> including the slurry pipeline/transfer station route , <br /> water supply pipelines , access roads , and diversion <br /> facilities disturbed by the project will be graded , back- <br /> fiiiec , recontoured , ana seeded/ revegetatec as per MLRD <br /> specifications . <br /> A, Surface Water Impact: <br /> viaring the tali n9 relGcation process , and subsequent <br /> reclamation activities , ditches and culverts have , c,+- will <br /> be , installed to prevent any contamination from entering <br /> the existing interceptor canals or other fresn water <br /> tributaries or otherwise impacting "Waters of the State" . <br /> - 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.