Laserfiche WebLink
4,,-17/21/1997 08: 45 3035724444 CROW COMPANY PAGE 02 <br /> II I I II I II I II IIII III <br /> chgym 999 <br /> %.-- 0.. Plexco <br /> Application Note No.8 QM <br /> system Testing <br /> Pressure Testing Considerations WARNING:Pips Res"int The pipe system <br /> section under test and any closur es in the test <br /> Guidelines for All Test Methods section should be restrained against sudden <br /> uncontrolled movement from catastrophic <br /> Leah testing may be conducted if specified by the fail Test equipment should be examined <br /> responsible Project Engineer or Owner. before pressure is app/kd to Insure that it Is <br /> tightly connected All low MsswvfUUng Imes <br /> Joints may be exposed to inspect for leakage. and other items not subject to the test pressure <br /> Testing may be conducted on the full system,or in should be disconnected or Isolated <br /> sections. The test section size is determined by WARNING: Personal Protection. Tate suitable <br /> test equipment capability. If the pressurizing or precautions to eliminate hazards to personnel <br /> pumping equipment is too small,it may not be near lines being tested Keep personnel a safe <br /> possible to complete the test within allowable distance away from the test section during <br /> testing time limits. If so,higher Capacity test testing, <br /> equipment,or a smaller test section may be WARNING: Test Equipment should be <br /> nece'ssary' examined before pressure Is applied to Insure <br /> Expansion Joints and expansion compensators that It is tightly connected AU low pressure <br /> should be temporarily restrained,or isolated,or flUing Ems and other items not subject to the test <br /> removed during the pressure test. pressure should be disconnected or Isolated <br /> The temperature of the test medium and the pipe <br /> test section should be the same,and if possible, References <br /> should be less than 100717.(38'C). Before <br /> applying test pressure,allow flare for the test The following reference publications provide <br /> medium and the pipe test section to equalize. At pressure testing information:ASME B31.1 Power <br /> temperatures above 100T(38°C),test pressure PiWM Section 137,Pressure Tests,and PPI <br /> must be reduced Contact Plexco/Spirolite for TR-31 Underground Installation of Polyolefin <br /> technical assistance with elevated temperature ,Section 7,System Testing. <br /> press testing. Plexco/Spirolite Technical Personnel should be <br /> Heat fusion Joints must be completely cooled consulted before using pressure testing procedures <br /> before pressure testing. See Plexco Bulletins 101 other than those presented here. Other pressure <br /> and 108 for fusion joining procedures, testing procedures may or may not be applicable <br /> depending upon piping products and/or piping <br /> CAUTION: Pipe system pressure testing Is applications. <br /> perfornned to discover unwpuptaWe faults in a <br /> piping system. Pressure testing may cause <br /> such faults to tan by leaking or rupturing. This <br /> may result In catastro"hic(allure. Piping <br /> system rupture may result in the sudden, <br /> forcible,uncontrolled movement of"an <br /> piping,or components,or parts of components. <br />