Laserfiche WebLink
Trapper Mine; C- 1981 -010 <br />RN6; Adequacy Review No. 3 <br />4 December 2012 <br />Post Mine Drainage Reestablishment and Stabilization: Sections 3.5.3 and 4.8.13: <br />4. During the October 4, 2012 site inspection, it was cited that several reestablished drainages will need to <br />be evaluated and an engineering design submitted to address erosion and stability issues observed. <br />Subsequently, the Division met with Trapper Mining on November 16, 2012 to discuss several items <br />including post mine drainage reestablishment /stability. During the meeting it was agreed that this issue <br />will need to be evaluated further by Trapper and a design will likely need to be submitted. In order to <br />facilitate processing the renewal application, this item would more appropriately be addressed with the <br />upcoming permit revision. <br />The current decision date for the application is December 31, 2012. If you have any questions, please feel free to <br />contact me at (303) 866 -3567 ext. 8120. <br />Sincerely, <br />Jared Ebert <br />Environmental Protection Specialist <br />Page 2 of 2 <br />