November 26, 2012 C-1981-041/Roadside Portals MPB <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection R -Roads <br /> R -Availability of Records Y -Reclamation Success <br /> N -Backfill &Grading Y -Revegetation <br /> NA -Excess Spoil and Dev.Waste N - Subsidence <br /> NA -Explosives NA - Slides and Other Damage <br /> Y -Fish &Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA -Other NA - Special Categories Of Mining <br /> R -Processing Waste Y -Topsoil <br /> COMMENTS <br /> This was a complete inspection of the Roadside Portals Mine conducted on November 26, 2012 by Mike Boulay <br /> of the Division of Reclamation, Mining and Safety Grand Junction Field Office. Tonya Hammond of Snowcap <br /> Coal Company(SCC)was present during the entire inspection. Weather conditions were sunny and cool. Ground <br /> conditions were dry. <br /> AVAILABILITY OF RECORDS —Rule 5.02.4(1): <br /> The availability of records was checked at J.E. Stover&Associates offices. No problems were noted with the <br /> records review. See the attached Availability of Records checklist. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.053; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> The remaining Sedimentation Pond 9 was inspected and was dry. The pond embankments, inlet and discharge <br /> structures were all stable and no problems were noted. Drainage and diversion ditches were stable and dry. <br /> Recent reclamation at the North Portal area included the final configuration of numerous permanent drainage <br /> channels and diversions. We walked and inspected the entire length of each diversion at the North Portal. <br /> Diversion Ditches (D-Dlthrough D13)were all found to be well constructed in accordance with approved designs. <br /> Several of these permanent channels and diversions are shown in the attached photographs at the end of this <br /> report. <br /> PROCESSING WASTE/COAL MINE WASTE PILES —Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 8 <br />