My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
11/28/2012 3:04:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 1 of 3 2011 phase 5 valley leach facility ore storage 1 OF 1
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1 Conformance Testing <br />Geomembrane manufactured by Poly -Flex was installed in the 2011 Phase 5 VLF OSA 3rd <br />Portion. A TRI /Environmental (TRI) (AMEC subcontractor) representative performed <br />geomembrane conformance sampling at the Poly -Flex plant in Grand Prairie, Texas. <br />Samples were sent to TRI's geosynthetic laboratory in Austin, Texas, for conformance <br />testing. Geomembrane rolls were not used on the project unless approved by AMEC based <br />on conformance test results. <br />Prior to the 40 -mil and 80 -mil geomembrane arrival to site, AMEC performed <br />39 conformance tests at a frequency of one test per 138,221 square feet, exceeding the <br />minimum specified testing frequency of one test per 150,000 square feet. Testing frequency <br />was based on AMEC's inventory of the 40 -mil and 80 -mil geomembrane. Conformance <br />testing for the 40 -mil smooth and 80 -mil single -sided textured LLDPE geomembrane used to <br />construct the 2011 Phase 5 VLF OSA 3 Portion liner system met specifications. <br />Conformance test results are presented in Appendix K. <br />6.2 Deployment Monitoring <br />Geomembrane panel deployment monitoring performed by AMEC included: <br />• Observation of panel surface condition and panel overlap; <br />• Assignment of panel numbers; <br />• Verification of factory roll number and receipt of complete certification <br />prior to allowing deployment; <br />• Measurement of sheet thickness; <br />• Documentation of deployed panel lengths; and <br />• Development of panel layout record drawing. <br />ame0 <br />Prior to the deployment of geomembrane, AMEC and Lone Star verified that the subgrade <br />was free of soft spots, protrusions, angular particles, abrupt grade changes, and loose soil. <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec corn 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.