Laserfiche WebLink
Page C -4 of 4 <br />• Permeability, laboratory and in -situ (falling head permeability ASTM D -5856) <br />Sampling and testing of the colluvium will be conducted annually for the first two years of the RPE <br />East operation. Additional testing will be conducted after the first two years of operation only when <br />there is an apparent change in the nature of the colluvium. <br />Analysis <br />Stability analyses will be performed during the first six months and periodically thereafter if <br />necessary, depending upon the monitoring and testing results. <br />Revised July 21, 2011 <br />P:\Mpls \06 CO\26 \06261003 RPE E. Permit Mod Support\WorkFiles \Permit Application\Appendix C Monitoring Plan\App C Monitoring Plan <br />2011 -07 -21 doc <br />