Laserfiche WebLink
iI-<);I� 17 YIPI WY,)U2 <br />STATE OF COLOIZADO <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT <br />AIR POLLUTION CONTROL DIVISION f'c <br />TELEPHONE: (303) 692 -3150 <br />H <br />CONSTRUCTION PERMIT �87bx* <br />PERMIT NO: 11 LP3252 <br />INITIAL APPROVAL <br />DATE ISSUED: NGV i n 2011 <br />ISSUED TO: GCC Energy, LLC <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Stationary coal screening plant, located at King II Mine, at 6473 County Road 120, Hesperus, La <br />Plata County, Colorado <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />AIRS <br />Point <br />Description <br />One (1) Cedar Rapid, Model: TSH 7203 -38 Screen, Serial <br />010 <br />Number: TRXS7203PDUBC1056, rated at 400 tons per hour. <br />Control is provided by water spray bars. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL <br />ACT C.R.S. (25 -7 -101 et se g, TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS <br />DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />REQUIREMENTS TO SELF - CERTIFY FOR FINAL APPROVAL <br />YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days after <br />commencement of the permitted operation or activity by submitting a Notice of Startup form to the <br />Division. The Notice of Startup form may be downloaded online at <br />www.cdphe. state .co.us /ap /downloadforms.htm), Failure to notify the Division of startup of the permitted <br />source is a violation of Air Quality Control Commission (AQCC) Regulation No. 3, Part B, Section III.G.1 <br />and can result in the revocation of the permit. <br />2. Within one hundred and eighty days (180) after issuance of this permit, compliance with the <br />conditions contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions, Failure to demonstrate compliance <br />within 180 days may result in revocation of the permit. (Information on how to certify compliance <br />was mailed with the permit.) <br />AIRS ID: 067/1103/010 <br />Page 1 of 7 <br />Version 2011 -3 <br />Mii ✓"-q <br />2117 <br />