Laserfiche WebLink
Ouray County Road & Bridge - 2012 <br />TRIPLE R PIT <br />Bucaneer Metro Escort Milestone Telar Pronone Perspective Plateau Labor Target Species <br />6/20/2012 Colona Pit 48oz 6oz 4hrs Sweet Clover, Jointed Goat Grass,Field Bindi <br />6/28/2011. 58oz 5hrs Kochia,redroot pigweed,pricldy Iettuce,Canad <br />8/31/201.2. 250oz 4.5hrs Canada Thistle, Kochia <br />6/27/2012 R &B Yard 96 96 3 1.5 hrs <br />19 -Jul R &B Yard 115 25 2 hrs <br />3 -Aug E3LM Pit 3.75 2.5 <br />total 96 461 9 86.75 19.5 <br />cost 0.3 0.331215' 2.92 19.1 816 4.38 2.56 85 <br />total cost 28.8 152.1 109 253.31 <br />1657.5 <br />543.59 1087.18 <br />