Laserfiche WebLink
Exhibit D —Minim Plan <br />A.) Gravel will be removed from the intermittent stream bed with a bulldozer and front end loader. The <br />gravel will be hauled via belly dumps and semis to area of construction in Washington County, Colorado. <br />Gravel may also be removed from the bank areas in the same manner. <br />B.) If the bank areas are disturbed, topsoil from the banks will be salvaged for a depth of 6"- 12" and <br />stockpiled until used in reclamation. No other earthmoving will occur, except actual gravel removal as <br />described in (A). <br />C.) No water diversions or impoundments should be needed. <br />D.) Gravel will be removed from the bed of the creek first, and then will move about the permitted area <br />due to consequences of high water periods. Work will occur in approximate (5) acre segments. The time <br />table for this permit should span at least 8 years. <br />