Laserfiche WebLink
Byzantine Quarry, LLC 2012 Improvements <br />1. Rebuilt all safety berms, they have been approved by MSHA. <br />2. Storm water sump was never previously constructed, it is currently under construction. <br />3. Rebuilt and resurfaced haul roads. <br />4. Installed all required signage per MSHA. <br />5. Reworked entire pit floor, it was left in an unsatisfactory condition. <br />6. The pit high walls and benches were also unsatisfactory, we are in the process of bringing <br />them into compliance. <br />7. The scales were out of compliance, they have been reworked and approved by MSHA. <br />