My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (6)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 1:33:40 PM
Creation date
11/21/2012 8:02:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
11/14/2012
Email Name
ZTT
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 14, 2012 C-1981-018/Deserado Mine ZTT <br /> Refuse Pile Ponds RP-1, RP-2/3, RP-4 and RP-5 were all dry during the time of inspection accept for the a <br /> minimal amount in the south eastern cell of Rp-2/3.No ponds were discharging and all spillways were stable and <br /> clear of debris. Embankments were well vegetated with no signs of instability and erosion. ` <br /> Ponds SS-I, SS-2, RR-1 and RRS-1 were dry. <br /> The Raw Water Lagoon was inspected.Water was being pumped from the river into the pond as well as from the <br /> pond to the facility area.No issues were with the lagoon were observed. <br /> Explosives, Rock Dust Tanks and Nitrogen Pump SAE areas were inspected. SAES were either bedded with gravel <br /> or surrounded by berms for sediment control.No erosion or instability was observed. <br /> e 41' <br /> Sedimentation Pond DP-1. B-seam dewatering pump. <br /> OTHER(SPECIFY): <br /> Rock dust tanks were observed to be getting refilled during the time of inspection. <br /> PROCESSING WASTE/COAL MINE WASTE PILES —Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> During the time of inspection refuse was being spread and compacted on refuse pile 5A. Refuse appeared to be <br /> spread and compacted in an estimated .5 ft to 1 ft. lifts. The refuse piles were well compacted and showed no signs <br /> of erosion, slumping or instability. <br /> ROADS —Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3) <br /> Drainage 4.03.1(4)/4.03.2(4) <br /> Surfacing and Maintenance4.03.1(5)and(6)/4.03.2(5)and (6) <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.