My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (6)
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 1:33:40 PM
Creation date
11/21/2012 8:02:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
11/14/2012
Email Name
ZTT
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 14, 2012 C-1981-018/Deserado Mine ZTT <br /> _ A <br /> ' f � <br /> "VIA <br /> FA <br /> Regraded borehole pad. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13, <br /> Drainage —Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Sedimentation Pond DP-1 held water at the time of the inspection and was not discharging. The emergency <br /> spillway was clear of debris and was well stabilized with rip rap. The primary spillway discharge point is located <br /> just beside the Scullion Gulch discharge point and is submerged beneath the ponding water in the area. Rip rap <br /> lined the ditches leading from the facility area to the pond was clear and stable. <br /> The B-Seam Mine Dewatering pump was running during the time of the inspection.Water currently has been <br /> filled up to the 5th cell of the B-seam dewatering pond system. Up to the date of this inspection,no water has yet <br /> to discharge from the B-seam Mine Dewatering Pond system. Vegetation has begun to grow along the topsoil piles <br /> between cells <br /> Ponds PP-1 and PP-1 also held water with no discharge. Pond embankments were stable and vegetated. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.