My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-20_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/21/2012 7:06:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
Email Regarding Cost Estimate Review (Part 1 of 2)
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
RN3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost <br />Permit Action: Permit Renewal <br />Site: Bowie No. 2 Mine 3 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/27/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />Pull back and Haul Portal Bench Fill Material to <br />Cut Slope <br />TRUCKI <br />1 <br />4 <br />2 <br />4 <br />4 <br />2 <br />4 <br />2 <br />4 <br />2 <br />4 <br />4 <br />1 <br />1 <br />4 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />1 <br />1 <br />609.56 <br />$402,028.91 <br />$203,852.52 <br />$12,710.00 <br />$5,781.15 <br />$2,232.37 <br />$10,829.00 <br />$10,588.76 <br />$75,129.00 <br />$41,769.31 <br />$219,799.00 <br />$221,298.06 <br />$7,242.98 <br />$45,139.82 <br />$57,568.78 <br />$52,702.40 <br />$1,180.00 <br />$615.32 <br />$11,138.16 <br />$113,245.09 <br />$618.79 <br />$47,718.10 <br />$827.76 <br />$24,693.43 <br />$2,434.08 <br />$931.00 <br />$25,542.88 <br />Regrade D -Portal Bench <br />DOZER <br />158.03 <br />Pull up Material for Utility Corridor <br />EXCAVATE <br />24.96 <br />Regrade Utility Corridor <br />DOZER <br />4.48 <br />Rip and Regrade Material Storage Area at Gob Pile <br />DOZER <br />1.73 <br />Pull Back Material @ Old Truck Loadout Material <br />Storage Area <br />EXCAVATE <br />21.27 <br />Regrade Old Truck Loadout Material Storage Area <br />DOZER <br />8.21 <br />Pull Back Material at Truck Loadout/Coal <br />Stockpile <br />EXCAVATE <br />147.57 <br />Regrade New Truck Loadout and Coal Stockpile <br />DOZER <br />32.38 <br />Pull Material Back onto Train L/O Facil. and <br />Railbed Benches <br />EXCAVATE <br />431.74 <br />Regrade Train Loadout Facilities and Railbed <br />Benches <br />DOZER <br />171.56 <br />Backfill and Regrade Train L/O Overland <br />Conveyor Corridor <br />DOZER <br />5.62 <br />Haul Fill from Upper Mat'l Strge Area to B -Seam <br />Portal Bench <br />SCRAPERI <br />82.40 <br />Haul Fill fr Adj. Mat'l Storage Area to B -Seam <br />Portal Bench <br />TRUCKI <br />89.33 <br />Backfill and Regrade B -Seam Portal Bench <br />DOZER <br />38.70 <br />Pull Material Back onto Freeman Gulch Vent Shaft <br />Bench <br />EXCAVATE <br />2.31 <br />Push mat'l from Freeman Gulch Vent Shaft back to <br />Cut Slope <br />DOZER <br />0.48 <br />Regrade Freeman Gulch Vent Shaft Pad <br />DOZER <br />8.63 <br />Regrade Drill Pads from MRs and TRs <br />DOZER <br />87.79 <br />Regrade Material Storage Area from TR -29 <br />DOZER <br />0.48 <br />Backfill and Regrade New Prep Plant Bench <br />DOZER <br />36.99 <br />Replace Fill from Material Storage Area to Water <br />Tank Bench <br />SCRAPERI <br />1.51 <br />Regrade Borrow Area <br />DOZER <br />19.14 <br />Regrade Hubbard Creek Vent Shaft Pad <br />DOZER <br />1.89 <br />Regrade Upper Parking Lot Expansion Area <br />EXCAVATE <br />3.65 <br />Haul Mat'l from Bowie No. 1 Stkpl to Hubbard <br />TRUCKI <br />26.68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.