My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_INSPECTION - C2009087
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2012-11-20_INSPECTION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:42 PM
Creation date
11/20/2012 8:44:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
11/20/2012
Doc Name
Inspection Report
From
DRMS
To
Scott Cowman
Inspection Date
11/14/2012
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 14, 2012 C- 2009 - 087 /Peabody Sage Creek Mine JDM <br />Ditches and culverts observed throughout the site were in excellent condition and functioning as designed. <br />Recently completed drainage reconstruction of Lower PM -6, Lower -End PM -6, Lower PM -4, PM -4 Overflow, <br />and SCM -IA were observed and were stable with no roblems noted. <br />Lower PM -6 <br />Lower End PM -6 <br />t <br />PM -4 <br />PM -4 <br />During the October 25, 2012 Inspection, the following maintenance items were noted: <br />- The septic system access road over the shop diversion ditch displayed erosion off the road and onto the box <br />culvert. This area has been addressed to ensure that the run -off from the pad reaches the shop diversion ditch. <br />- Ditch FA -D 1 will need to be reestablished to ensure proper drainage and alleviate the runoff from being <br />redirected over the road. Ditch FA -D 1 has been reestablished and no problems were noted. <br />- A large amount of material was in place at the northern most portion of RC -D3. This material has been cleared <br />and the culvert installed based on the original plan has been removed. <br />All disturbances have been seeded. <br />GENERAL MINE PLAN COMPLANCE: <br />The Peabody Sage Creek Mine is currently not extracting coal. The site is continuing development activities and <br />conducting ongoing mining activities on site. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.