Laserfiche WebLink
November 16, 2012 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />Dear Ms. Burgmaier: <br />J. E. STOVER & ASSOCIATES, INC. <br />2352NORTH 7 STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -133, Four Utility Holes one Gob Vent Hole <br />Permit C- 1996 -083 <br />R� <br />mafo <br />By letter dated November 14th, I submitted an application for a minor revision to allow <br />the installation of four utility holes. Bowie Resources, LLC, (BRL) needs to add one <br />gob vent hole to this minor revision. The need for the new GVB has arisen due to <br />increased gas levels encountered during a specific step in the longwall shield removal <br />process. Please dispose of the MR -133 materials mailed on November 14th. <br />On behalf of BRL, enclosed is an application for a minor revision to allow the installation <br />of four utility holes and one gob vent hole. The four utility holes will be drilled from an <br />existing disturbed area located north of the large fans located on the utility bench. No <br />new disturbance is anticipated from the utility hole drilling activity. The gob vent hole <br />and associated road will disturb approximately 1.3 acres. <br />Project Narrative <br />The disturbed area located north of the large ventilation fan will be shaped to form a <br />small drill pad. A mud pit will be constructed south of the drill pad. Four utility holes will <br />be drilled from the single drill pad. The 10 inch diameter holes will extend from the <br />surface to the B -Seam a length of approximately 520 feet. The purpose of the holes is <br />to run utilities from the D -Seam to the B -Seam. The holes will be sealed from the <br />surface down to the D -Seam. The area will be reshaped and seeded. All run -off from <br />the drilling activities will be collected in a sediment pond so no alternative sediment <br />control is required. <br />The gob vent hole will be drilled where shown on Map 9. Alternate sediment control will <br />be provided as shown on Maps 36, 36a and 36b. <br />Right of Entry <br />The proposed utility holes and gob vent hole will be installed on surface owned by BRL. <br />