Laserfiche WebLink
Yoast Mir <br />Table 3 <br />SCC Bond Release Requested vs DRMS Proposed Approval <br />Currently SCC DRMS <br />Task # Description Approved Requested Proposed <br />5 Grade Drill Pads Associated with Minor Revision 18 $966.57 $966.57 $0.00 - $966.57 <br />10 <br />Rip Permanent Roads <br />$3,534.00 <br />$3,534.00 <br />$3,534.00 <br />$0.00 <br />11 <br />Rip Haul Roads <br />$14,641.00 <br />$14,641.00 <br />$14,641.00 <br />$0.00 <br />12 <br />Rip Facilities Area <br />$2,524.00 <br />$2,524.00 <br />$2,524.00 <br />$0.00 <br />13 <br />Rip Explosives Area <br />$1,868.00 <br />$1,868.00 <br />$1,868.00 <br />$0.00 <br />14 <br />Rip Final Regraded Areas <br />$10,097.00 <br />$10,097.00 <br />$0.00 <br />- $10,097.00 <br />1S <br />Narrow Permanent Roads <br />$4,672.54 <br />$4,672.54 <br />$4,672.54 <br />$0.00 <br />19 <br />Grade Permanent Roads to Blend <br />$4,049.00 <br />$4,049.00 <br />$4,049.00 <br />$0.00 <br />20 <br />Grade Haul Roads to Blend <br />$9,268.00 <br />$9,268.00 <br />$9,268.00 <br />$0.00 <br />21 <br />Grade Light -Use Roads <br />$1,219.00 <br />$1,219.00 <br />$1,056.00 <br />- $163.00 <br />22 <br />Regrade Temporary Access Road to Drill Pad #2 from Minor Revision 18 <br />$366.80 <br />$366.80 <br />$0.00 <br />- $366.80 <br />23 <br />Regrade Temporary Access Road to Pond 010 <br />$516.97 <br />$516.97 <br />$516.97 <br />$0.00 <br />24 <br />Grade Haul Road Surface Material into Fill <br />$21,766.80 <br />$21,766.80 <br />$21,766.80 <br />$0.00 <br />25 <br />Grade Facilities Area Surface Material into Fill <br />$2,667.09 <br />$2,667.09 <br />$2,667.09 <br />$0.00 <br />28 <br />Finish Grade All Areas <br />$4,419.00 <br />$4,419.00 <br />$0.00 <br />- $4,419.00 <br />02a <br />Grade Valora Pit N/S Highwall <br />$55,926.55 <br />$55,926.55 <br />$0.00 <br />- $55,926.55 <br />02b <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />$6,932.15 <br />$6,932.15 <br />$0.00 <br />- $6,932.15 <br />02c <br />Grade Neck Pit Highwall <br />$1,583.57 <br />$1,583.57 <br />$0.00 <br />- $1,583.57 <br />30 <br />Regrade Pond 010 <br />$14,102.80 <br />$14,102.80 <br />$14,102.80 <br />$0.00 <br />31 <br />Regrade Pond 011 <br />$7,887.22 <br />$0.00 <br />$0.00 <br />$0.00 <br />32 <br />Regrade Pond 012 <br />$25,130.24 <br />$0.00 <br />$0.00 <br />$0.00 <br />33 <br />Regrade Pond 014 <br />$13,991.85 <br />$13,991.85 <br />$0.00 <br />- $13,991.85 <br />34 <br />Regrade all ditches <br />$1,652.00 <br />$1,652.00 <br />$1,561.00 <br />- $91.00 <br />35 <br />Construct Post - Mining Drainage Channels <br />$186,319.47 <br />$186,319.47 <br />$21,493.54 <br />- $164,825.93 <br />36 <br />Regrade Pond 11A <br />$7,477.28 <br />$0.00 <br />$0.00 <br />$0.00 <br />37 <br />Regrade Pond 12A <br />$11,678.70 <br />$0.00 <br />$0.00 <br />$0.00 <br />03a <br />Grade Valora Pit N/S Spoil Ridges <br />$20,230.89 <br />$20,230.89 <br />$0.00 <br />- $20,230.89 <br />03b <br />Grade Valora Pit E/W (Scraper Pit) Spoil Ridges <br />$3,538.79 <br />$3,538.79 <br />$0.00 <br />- $3,538.79 <br />03f <br />Grade Neck Pit Spoil Ridges <br />$807.94 <br />$807.94 <br />$0.00 <br />- $807.94 <br />40 <br />Replace Topsoil from Stockpile A to Pond 010 <br />$34,253.84 <br />$0.00 <br />$0.00 <br />$0.00 <br />41 <br />Replace Topsoil from Stockpile B to Shop Area <br />$25,895.79 <br />$0.00 <br />$0.00 <br />$0.00 <br />43 <br />Replace Topsoil from Stockpile Haul Fill from to Neck Pit <br />$49,789.13 <br />$0.00 <br />$0.00 <br />$0.00 <br />