<br />Table 3
<br />SCC Bond Release Requested vs DRMS Proposed Approval
<br />Currently SCC DRMS
<br />Task # Description Approved Requested Proposed
<br />5 Grade Drill Pads Associated with Minor Revision 18 $966.57 $966.57 $0.00 - $966.57
<br />10
<br />Rip Permanent Roads
<br />$3,534.00
<br />$3,534.00
<br />$3,534.00
<br />$0.00
<br />11
<br />Rip Haul Roads
<br />$14,641.00
<br />$14,641.00
<br />$14,641.00
<br />$0.00
<br />12
<br />Rip Facilities Area
<br />$2,524.00
<br />$2,524.00
<br />$2,524.00
<br />$0.00
<br />13
<br />Rip Explosives Area
<br />$1,868.00
<br />$1,868.00
<br />$1,868.00
<br />$0.00
<br />14
<br />Rip Final Regraded Areas
<br />$10,097.00
<br />$10,097.00
<br />$0.00
<br />- $10,097.00
<br />1S
<br />Narrow Permanent Roads
<br />$4,672.54
<br />$4,672.54
<br />$4,672.54
<br />$0.00
<br />19
<br />Grade Permanent Roads to Blend
<br />$4,049.00
<br />$4,049.00
<br />$4,049.00
<br />$0.00
<br />20
<br />Grade Haul Roads to Blend
<br />$9,268.00
<br />$9,268.00
<br />$9,268.00
<br />$0.00
<br />21
<br />Grade Light -Use Roads
<br />$1,219.00
<br />$1,219.00
<br />$1,056.00
<br />- $163.00
<br />22
<br />Regrade Temporary Access Road to Drill Pad #2 from Minor Revision 18
<br />$366.80
<br />$366.80
<br />$0.00
<br />- $366.80
<br />23
<br />Regrade Temporary Access Road to Pond 010
<br />$516.97
<br />$516.97
<br />$516.97
<br />$0.00
<br />24
<br />Grade Haul Road Surface Material into Fill
<br />$21,766.80
<br />$21,766.80
<br />$21,766.80
<br />$0.00
<br />25
<br />Grade Facilities Area Surface Material into Fill
<br />$2,667.09
<br />$2,667.09
<br />$2,667.09
<br />$0.00
<br />28
<br />Finish Grade All Areas
<br />$4,419.00
<br />$4,419.00
<br />$0.00
<br />- $4,419.00
<br />02a
<br />Grade Valora Pit N/S Highwall
<br />$55,926.55
<br />$55,926.55
<br />$0.00
<br />- $55,926.55
<br />02b
<br />Grade Valora Pit E/W (Scraper Pit) Highwall
<br />$6,932.15
<br />$6,932.15
<br />$0.00
<br />- $6,932.15
<br />02c
<br />Grade Neck Pit Highwall
<br />$1,583.57
<br />$1,583.57
<br />$0.00
<br />- $1,583.57
<br />30
<br />Regrade Pond 010
<br />$14,102.80
<br />$14,102.80
<br />$14,102.80
<br />$0.00
<br />31
<br />Regrade Pond 011
<br />$7,887.22
<br />$0.00
<br />$0.00
<br />$0.00
<br />32
<br />Regrade Pond 012
<br />$25,130.24
<br />$0.00
<br />$0.00
<br />$0.00
<br />33
<br />Regrade Pond 014
<br />$13,991.85
<br />$13,991.85
<br />$0.00
<br />- $13,991.85
<br />34
<br />Regrade all ditches
<br />$1,652.00
<br />$1,652.00
<br />$1,561.00
<br />- $91.00
<br />35
<br />Construct Post - Mining Drainage Channels
<br />$186,319.47
<br />$186,319.47
<br />$21,493.54
<br />- $164,825.93
<br />36
<br />Regrade Pond 11A
<br />$7,477.28
<br />$0.00
<br />$0.00
<br />$0.00
<br />37
<br />Regrade Pond 12A
<br />$11,678.70
<br />$0.00
<br />$0.00
<br />$0.00
<br />03a
<br />Grade Valora Pit N/S Spoil Ridges
<br />$20,230.89
<br />$20,230.89
<br />$0.00
<br />- $20,230.89
<br />03b
<br />Grade Valora Pit E/W (Scraper Pit) Spoil Ridges
<br />$3,538.79
<br />$3,538.79
<br />$0.00
<br />- $3,538.79
<br />03f
<br />Grade Neck Pit Spoil Ridges
<br />$807.94
<br />$807.94
<br />$0.00
<br />- $807.94
<br />40
<br />Replace Topsoil from Stockpile A to Pond 010
<br />$34,253.84
<br />$0.00
<br />$0.00
<br />$0.00
<br />41
<br />Replace Topsoil from Stockpile B to Shop Area
<br />$25,895.79
<br />$0.00
<br />$0.00
<br />$0.00
<br />43
<br />Replace Topsoil from Stockpile Haul Fill from to Neck Pit
<br />$49,789.13
<br />$0.00
<br />$0.00
<br />$0.00