My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-05_REVISION - C1980006 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2012-11-05_REVISION - C1980006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:19 PM
Creation date
11/13/2012 2:38:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
11/5/2012
Doc Name
Letter & Application
From
Energy Fuels Coal, Inc
To
DRMD
Type & Sequence
SL5
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerr (Marr) Mine - Phase III Final Bond Release Req uest - Permat # C -80 -006 <br />9 <br />TABLE 3 <br />RECLAMATION AND MANAGEMENT HISTORY SUMMARY <br />Kerr (Marr) Mine Site <br />Date <br />Reclamation and Maintenance Activities <br />Area/ Volume <br />1979- <br />1981 <br />Contemporaneous reclamation, Marr Pit area. Backfilling, topsoil <br />replacement and seeding of the Marr Pit area <br />1979 - 1986 <br />106.6 acres <br />Fall <br />1983 <br />Interseeding of 4 small parcels within the Marr Pit area <br />Fall <br />1983 <br />Contemporaneous reclamation. Backfilling, topsoil replacement and <br />seeding Rye mulch crop in the southern extension & SE perimeter of <br />the Marr Pit area <br />Mowing of mulch crop & reseeding with permanent seed mix <br />Fall <br />1986 <br />Contemporaneous reclamation. Backfilling, topsoil replacement and <br />seeding Rye mulch crop in the southmost extension of the Marr Pit <br />Mowing of mulch crop & reseeding with permanent seed mix <br />1993 <br />1993 <br />Final backfilling and reclamation of the 720 Pit: <br />Final backfilling and reclamation of Pit #1: <br />5.8 million yds. <br />1.1 million yds. <br />April <br />1994 <br />TR -12: Phase I Partial Bond Release Application <br />1994 <br />Seeded mulch crop of wild rye in 720 Pit <br />163.8 acres <br />Jan <br />1995 <br />TR -13: OSM Settlement Agreement for Pit #1. <br />Kerr places additional fill material in Pit 1 to create a ridge feature <br />Approximate <br />420,000 cu yd <br />1995 <br />Seeded mulch crop of wild rye in Pit #1 <br />55.8 acres <br />July <br />1995 <br />Bond Reduction. Due to mine plan change (TR -07). The plan to mine <br />the North Lease Area (north of County Road 12E) was cancelled. <br />$989,356. <br />July <br />1995 <br />Phase I Partial Bond Release - 720 Pit & Pit 1 <br />$2,692,733. <br />Fall <br />1995 <br />Seeding of permanent seed mix in 720 Pit & Stockpile areas <br />163.8 acres <br />Kerr (Marr) Mine - Phase III Final Bond Release Req uest - Permat # C -80 -006 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.