Laserfiche WebLink
Specific structures <br />TABLE 2 <br />BOND RELEASE STRUCTURES AND AREAS <br />Kerr (Marr) Mine Site <br />and areas requested for final phase III bond release are as follows: <br />Mine Site <br />Release of all liabilities and areas for the following: <br />4 acre parcel located south of and adjacent to the mine shop; <br />4 acre parcel located south of and adjacent to the former <br />(removed) powder magazine area; <br />Mine access road accessing the two 4 acre parcels (above) <br />Acres <br />4 <br />4 <br />9 <br />Loadout <br />Site <br />Release of all liabilities and areas associated with the Loadout site to <br />include the former pond footprint, the related inflow ditch and the <br />access road to the site. <br />11.7 <br />Total Acres for Final Phase III Bond Release <br />28.7 <br />Kerr (Marr) Mine - Phase III Final Bond Release Request - Permat # C -80 -006 <br />Refer to Phase 3 Bond Release Maps in Appendix D. <br />8 <br />