My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-05_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2012-11-05_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:19 PM
Creation date
11/13/2012 2:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
11/5/2012
Doc Name
Letter & Application
From
Twentymile Coal Company
To
DRMS
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A brief evaluation of the total projected impact from a 10 -year, 24 -hour rainfall event is illustrative of the <br />effectiveness of chisel plowing and contour furrowing techniques. The projected precipitation from a 10 -year, 24- <br />hour rainfall event is 1.8 inches, or 6,534 cubic feet per acre. <br />The water detention capacity of reclaimed sites prepared with both chisel - plowing and contour furrowing <br />techniques amounts to 5,121 cubic feet per acre, or 78% (1.41 inches) of the projected 10 -year, 24 -hour rainfall <br />event. Therefore, the total amount of water capable of becoming surface runoff from a rainfall event of this <br />magnitude is only .39 inches. <br />Research recently conducted at Energy Mine No. 1 and at the Edna Mine demonstrates that a reasonable estimate <br />for infiltration of water on reclaimed land is 85% of detention capacity (McWhorter 1979; John Gilley, USDA - <br />SEA unpublished data). Hence, the infiltration potential of reclaimed lands within the proposed permit area is 1.19 <br />inches or approximately three times greater than total potential surface water runoff (.39 inches) from a 10 -year, <br />24 -hour rainfall event. Consequently, the detention capacity and infiltration potential of reclaimed lands taken <br />together, will allow all rainfall to be potentially available for plant growth, and will minimize runoff from <br />reclaimed lands. <br />The aforementioned surface treatments are designed to reduce overland flow of water and shall be supplemented <br />by techniques suggested by Clyde, et al., (1978) if the need arises. The techniques recommended by these <br />researchers include the use of barriers, check dams, erosion stops, matting and roughened surfaces. These <br />treatments can be implemented with various kinds of straw bales, nettings and mattings to effectively reduce <br />overland flow. If results of the annual rill and gully survey indicate excessive erosion has occurred, Twentymile <br />Coal Company will initiate remedial measures. Gullies may be blocked with one of the above - mentioned <br />treatments to provide the opportunity for natural stabilization through the growth of vegetation. Corrective actions, <br />where needed, will be completed by October 31 of the year following the survey. <br />Since the intent of Rule 4.14.6 is to allow stabilization through means other than regrading, every alternative <br />means will be employed prior to using machinery to alleviate an erosion problem. If such action becomes <br />necessary, one of the small rubber -tired farm tractors utilized in reclamation will be allowed on the site to re -grade <br />the gully. Once a site is regraded, it will immediately be planted to the appropriate perennial seed mixture. <br />Details concerning the backfilling and soil stabilization of the Fish Creek Tipple operation are found within <br />Volume VII, Fish Creek Tipple /Loadout Appendix, on pages 2.05 -33 through 2.05 -37. <br />RESPONSE <br />The location and volume of all stockpiled topsoil materials are shown on Map 29, Reclamation. <br />Topsoil stockpiles are located on stable surface areas where the likelihood of disturbance or contamination by the <br />mining operations is minimal. Stabilization of the storage piles has been achieved with one of the perennial seed <br />mixtures. <br />In the event that the side slopes of the revegetated topsoil stockpiles do not become adequately vegetated, then <br />alternate methods may be used for stabilizing the side slopes. The slopes may be reduced to facilitate revegetation <br />or an erosion netting or a geotextile may be placed over areas that are not adequately revegetated. <br />Permit Renewal No. 3 <br />2.05 -107 4/1/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.