Laserfiche WebLink
(e) A plan for revegetation to meet the requirements of 4.15. including. but not limited to. description of the: <br />(i) Schedule of revegetation: <br />(ii) Species and amounts per acre of seeds and seedlings to be used: <br />(iii) Methods to be used in planting and seeding; <br />(iv) Mulching techniques; <br />(v) Irrigation, if appropriate and pest and disease control measures, if any; <br />'(vi) Measures proposed to be used to determine the success of revegetation in accordance with 4.15.7; and <br />(vii) Soil testing plan for evaluation of the results of topsoil handling and reclamation procedures related to <br />revegetation and topsoil standards of 4.06. <br />RESPONSE: <br />A.diverse, effective and permanent vegetation cover capable of supporting the proposed post - mining land uses <br />shall be established on disturbed areas through implementation of the revegetation plan <br />2.Os - 8/12/98 <br />