Laserfiche WebLink
VI. Demolition and Disposal Costs (based on Mean's <br />Building Construction Cost Data 1984) <br />A. Buildings <br />Demolition and Disposal of Steel = $0.15 /ft3 <br />70,536 ft x $0.15 /ft = <br />B. Foundations and Footers <br />Concrete demolition and disposal = $0.21 /ft <br />6,598 ft x $0.21 /ft = <br />C. Rail Lines <br />$11.65 /1inear foot <br />6,400 ft. x $11.65 /ft. = <br />2.05 - 32 <br />Revised April 5, 1985 <br />V. Manpower Cost (based on Mean's Building Construction Cost Data 1984) <br />A. Heavy equipment operator rate = $19.70 /hr. <br />69 hrs. required (48 hrs. dozer + 21 hrs. grader) <br />69 hr. x $19.70 /hr. = $1,359 <br />D. Total Demolition and Disposal Cost <br />1. Buildings $10,580 <br />2. Foundations and Footers $ 1,386 <br />3. Rail Lines $74,560 <br />TOTAL $86,526 <br />VII. Other Costs <br />A. Revegetation (based on past experience) <br />Assume: cost($)acre <br />Perennial Seed 25 <br />Chisel plowing and seeding 95 <br />Contour furrowing 40 <br />Labor (2 operators) 10 <br />TOTAL $170 /acre <br />$10,580 <br />$ 1 <br />$74,560 <br />