Laserfiche WebLink
C. Buildings <br />1. Secondary Crusher Building Metal Siding, <br />Skeleton Structure 36 ft. x 20 ft. x <br />52 ft. h = <br />2. Loadout Metal Siding, Skeleton Structure <br />18 ft. x32 ft. x56ft.h= <br />3. Pumphouse (2 each) Metal Siding 10 ft. <br />x 6 ft. x 7 ft. h= 420 ft. x 2= <br />STEEL TOTAL <br />O. Rail line 6,400 feet long <br />2.05 - 29 <br />Revised April 5, 1985 <br />37,440 ft.3 <br />32,256 ft.3 <br />840 ft. <br />70,536 ft.3 <br />E. Foundations and Footers (Concrete Quantities) <br />1. Screening Building <br />Slab 15 yd <br />Pier and Grate 15 yd <br />Footing 23 yd <br />SUBTOTAL 53 yd <br />53 yd x 27 ft /yd = 1,431 ft <br />2. Shoot Foundation and Conveyors <br />Footings and Mats 90.3 yd <br />Piers 27.7 yd <br />SUBTOTAL 118 yd <br />118 yd x 27 ft /yd = 3,186 ft <br />3. Transfer Point <br />Footing 34.3 yd <br />Pier 5 yd3 <br />SUBTOTAL 39.3 yd <br />39.3 yd x 27 ft /yd = 1,061 ft <br />4. Pumphouse (2 each) 60 ft x 2 = 120 ft <br />5. Substation 40 ft. x 20 ft. x 1 ft. = 800 ft <br />CONCRETE TOTAL 6,598 ft3 <br />