Laserfiche WebLink
3. Topsoiling <br />There are 2 main topsoil stockpiles on site that were constructed when the site was initially <br />disturbed from the previous operator. The topsoil pile west of the infiltration pond will be used to <br />topsoil the eastern portion of the disturbed area. This pile is approximately 9,000 cy in size. <br />The topsoil pile located north of the access road contains approximately 8,000 cy and will be used <br />to reclaim the western portion of the disturbance. <br />Topsoil will be spread evenly over the entire disturbed area to a depth of 6 inches. Using the area <br />of 21.13 acres, this is a volume of 17,044 cy. <br />